﻿<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:trackback="http://madskills.com/public/xml/rss/module/trackback/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/"><channel><title>BlogJava-意志、品质、成就、成熟、人生！</title><link>http://www.blogjava.net/maximo/</link><description>身是菩提树，心如明镜台，时时勤拂拭，勿使惹尘埃!</description><language>zh-cn</language><lastBuildDate>Wed, 03 Dec 2008 08:30:46 GMT</lastBuildDate><pubDate>Wed, 03 Dec 2008 08:30:46 GMT</pubDate><ttl>60</ttl><item><title>如何用采购创造效益-AMT</title><link>http://www.blogjava.net/maximo/archive/2008/11/25/242579.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Tue, 25 Nov 2008 08:31:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/11/25/242579.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/242579.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/11/25/242579.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/242579.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/242579.html</trackback:ping><description><![CDATA[<p>某化工企业，两年前曾位列国内市场份额前三名，然而随着市场竞争日益激烈，利润持续下降，已持续两个季度亏损，库存越来越大，销售存货超过3个月，市场库存为7个月，同时公司的市场份额下降到了第十位。公司正面临支付经销商库存补贴和供应商的原材料付款违约金的危机，眼看第三季度又要亏损。 <br />
<br />
　　在该公司总经理王先生的办公桌上，摆着跨国巨头宝洁公司一份成功的供应链管理变革分析报告，宝洁在进行供应链管理变革后的一系列数据深深撞击着王总：市场份额增长4%；客户定货数量增加了30%；顾客仓库的库存量从19天降到6天；年库存周转次数从19次增加到60次；存货可得性从96.4%增加到99.2%；退货率降低了60%；货物残损率减少20%～40%。 <br />
<br />
　　对于供应链管理，王总并不陌生，他在清华大学学习时曾选修过这门课。企业总是通过一条链条去满足客户需求，企业竞争力的高低与这条链条的管理效率息息相关。王总关注自己公司的供应链管理水平已经好几个月了，宝洁公司成功的管理实践促使王总下定决心：进行一次供应链管理变革，并谋求北大纵横管理咨询公司的管理支持。 <br />
<br />
<strong>　　找到问题并解决</strong> <br />
<br />
　　为了解决问题，首先需要发现问题。基于访谈、资料收集，并借助于对标，王总和管理层明确了公司供应链管理的部分关键指标状况如下：该公司的库存周转速度为1.8次/年，行业标杆为4.4次/年；该公司的定单实现率为75%，行业标杆为92%；预测的精确度为58%，行业标杆为94%；材料供应商为257家，行业标杆为130家；采购价格高于行业标杆企业水平的15%。 <br />
<br />
　　经过深入分析，公司判断产生上述状况的原因在于：不了解顾客真正的需求，供应链管理与客户脱节、与市场脱节；很大程度上，推销是建立在库存基础上；当初没有意识到2年后的市场对产品的要求是速度和成本竞争，没能抓住产品竞争的关键因素，并着手培养公司的核心能力；计划和采购仍然是销售的配角，落后于竞争对手的战略部署；公司高层对计划和采购缺乏真正的了解和关注。 <br />
<br />
　　找到了公司供应链管理中出现的问题和面临的挑战，公司很顺利地在对标分析的基础上确定了供应链管理的改善目标：半年内，供应链库存降到1～1.5月；4个月内，原辅料的可得到比率达到93%；4个月内，采购供应计划的准确度不低于90%；8个月内，优化供应基础，供应商数量在现有基础上下降40%，提高采购的集中度；10个月内，采购成本在现有基础上下降20%。 <br />
<br />
　　为了保障供应链管理水平的提升，公司把上述绩效改进目标分解到各个相关岗位和员工，并将其与对员工的考核激励相结合。 <br />
<br />
<strong>　　进行外部资源管理</strong> <br />
<br />
　　根据一份&#8220;战略与商业调查报告&#8221;的结论，建立并维持与供应商关系的能力被列为企业双赢采购能力中最关键的能力。但是几乎所有的公司都表示，他们还没有完全发展这一能力。其中，占调查总数18%的公司表示已经和一半以上的供应商建立了战略关系，但是大多数公司承认与他们建立战略关系的供应商远远不到一半。 <br />
<br />
　　随着企业对产业链条理解程度的深入和通信技术手段、物流技术的发展，企业对供应商的管理要求正从采购管理向外部资源管理转变。企业的外部资源整合指的是不局限于企业内部，而把供应链内的供应商等外部资源也作为管理对象，并实现订单、采购、库存、计划、生产制造、质量控制、运输、分销、服务与维护、财务、人事、工程技术等的有效管理。 <br />
<br />
　　首先，企业要加强对供应商的培训。一般来说，企业与供应商虽然没有产权关系，但采购企业一般在行业有一定的规模和影响力，在主要原料的采购方面有相当的谈判能力。因此，企业可以从管理上把部分供应商视同公司的一部分，加强对供应商的质量、工艺、安全等方面的培训，提升供应商的成本控制能力和质量管理水平。 <br />
<br />
　　其次，供应商不是仓库，在制定企业的供应链策略时不能让供应商不顾及自身的生产运作特点，不断地减少批量的规模、增加批次。这样只会增加供应商的成本，从而增加企业自身的采购成本。企业要降低采购成本，与供应商的关系要实现从一般的供需关系向战略合作伙伴关系的转变。 <br />
<br />
　　企业必须确保供应商对企业供应链的战略和技术有基本的了解和认识，使供应商与企业在战略上保持一致。与供应商保持长期、互惠互利的合作关系，能够保证双方精诚合作，共同积极地解决问题，并有效弱化供应商对短期利益的过分追逐。 <br />
<br />
　　当然，在现有商业环境下，建立供需双方的战略合作伙伴公司比较困难，有一定的风险。但是，采购企业可以从供货量大、信誉好、品质好的供应商中选择一部分企业并与他们签署战略合作协议，以达成以下目标： <br />
<br />
　　○ 集中精力于相对专一的供应源，通过建立不同层次的供应商网络，整合供应规模，减少供应商数量以降低管理难度，同时获得规模经济； <br />
<br />
　　○ 建立可能的备选主供应商，集中采购的同时，从备选供应商中少量采购，维持良好的商业关系，为可能的采购中断风险做好准备； <br />
<br />
　　○ 提前与供应商共享销售信息和库存信息，改变销售库存、经销商库存的统计方式，避免信息扭曲，进而解决库存问题； <br />
<br />
　　○ 提高原辅材料供应的保障程度，必要时要求供应商在公司生产所在地设立仓库，降低不可预测需求带来的信用风险、产品质量风险和运输风险等问题； <br />
<br />
　　○ 为双方共同解决问题创造便利条件； <br />
<br />
　　○ 让双方都从降低交易成本中获得利益； <br />
<br />
　　○ 消除采购供应过程中的组织障碍； <br />
<br />
　　○ 通过在战略层面上建立合作关系避免了在日常琐事上的无端浪费，为准时化采购创造了条件。 <br />
<br />
<strong>　　为订单采购</strong> <br />
<br />
　　迈克尔*戴尔说过：&#8220;多余的库存通常是源自于对市场的盲目不清，或者源于对货物短缺的担心。&#8221;企业采购的产品必须是市场&#8220;需要的&#8221;，而不是工厂要&#8220;生产的&#8221;。 <br />
<br />
　　为订单采购的内涵是一体化协同计划，这种计划是在公司高层领导下建立跨部门的计划流程，计划是综合各部门的要求和预测而制定的，它的结果反映了需求和供应的动态平衡。 <br />
<br />
　　供需双方通过签订长期的合作合同，可以简化采购手续，降低交易成本。采购重点在于协调制造计划、采购计划、销售计划同步执行，缩短响应时间。企业与供应商共享制造信息，将对采购产品的需求直接传递到制造部门，可以既减轻采购部门的工作负荷，也减少不增值过程，使供需保持同步，减少损失。 <br />
<br />
　　最后，本文开始提到的那家化工企业将定期的供应销售沟通会议由每月一次改为每周一次，会议主题包括：终端、渠道、公司三者每周的销售状况；渠道、公司、供应商三者的供应链库存；每周供货状况；后补订单情况；新产品上市最新状态；预测更新。 <br />
<br />
　　经过一年多的运行，该公司的供应链管理水平大幅提升。我们期待通过实施战略采购，更多的企业能用采购为自己创造更多的收入。</p>
<img src ="http://www.blogjava.net/maximo/aggbug/242579.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-11-25 16:31 <a href="http://www.blogjava.net/maximo/archive/2008/11/25/242579.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>项目接近尾声时不能忽视的10件事</title><link>http://www.blogjava.net/maximo/archive/2008/09/24/230940.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Wed, 24 Sep 2008 09:23:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/09/24/230940.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/230940.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/09/24/230940.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/230940.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/230940.html</trackback:ping><description><![CDATA[对于你的组织规模，你可以把项目管理视为一项偶尔的实践或者可以拥有一个复杂的PMO。不论那种情况，你可能通过典型的项目初始、精化和构建过程。但是到了项目终结的时候，很多项目经理只讨论短期的终点线。最后的步骤处理不好会给行动增加混乱并且可能导致客户不满、员工不悦，并把项目拖得比所需时间更长。 <br />
　　 <br />
　　这里是一些你需要在达到你下一个项目的终点时要考虑的事情。其中有些项目是纯管理的，但其中很多能帮助你进一步保证你的项目能够成功。 <br />
<br />
　　<strong>一、最终测试 <br />
</strong><br />
　　测试会耗费人员，而我们很多人都不愿意去做——特别是做过几轮之后。我见过大量的四到六个月的项目有一两天的计划去测试。没有安排适当数量测试的项目通常在实施的最初几周内因问题而结束。这里不要走捷径和将测试的重要性减至最小；否则，你会为痛苦的进展过程而承担额外的风险。 <br />
<br />
　<strong>　二、最终培训 <br />
</strong><br />
　　用户？谁关心用户？好了，很多项目都为了他们的利益而做，所以确信把你所有的测试资料完成并移交。这个不做好最有可能体现在发怒的客户半夜三更打来的愤怒的电话上。 <br />
<br />
　　<strong>三、确认交付物 <br />
</strong><br />
　　你检查了所有的箱子并清理了收件箱，而且你想真地结束了。但你的客户怎么想？安排时间和你的客户检查所有的交付物并且确认他们已经得到满足了。有些情况下，可能有一些特殊问题到你计划终止日期时尚未解决。在你项目的早些时候，应该有一份协议来决定如果发生这样的情况会如何影响你的结束日期。 <br />
<br />
　　<strong>四、获得项目签字 <br />
</strong><br />
　　当你获得所有交付物都已满足的认可以后，请求在项目文档上做一个正式的签字。这样做帮助确保所有人都认可项目状态。因为这个签字通常标志着项目的正式结束，注意不要让你的客户感觉签字的压力。如果他们在不明所以的情况下做了，你可能会在日后出现问题的时候最终得到一个不满意的客户。 <br />
<br />
　　<strong>五、解散团队 <br />
</strong><br />
　　现在项目完成了，你的团队何去何从？基于你的组织，他们可能被送回一个开发池或者去做业务。或者他们需要在企业内部为自己发起一些工作。不管是什么，你要保证花点时间和他们在一起，并且设置一个明确的不再需要他们的服务的最后日期。同时不要忘了你可能需要完成一些需要加入他们档案的业绩审核文档。 <br />
<br />
　　<strong>六、分析实际与计划的对比 <br />
</strong><br />
　　资源——你是否真正摆脱了10周只有一个开发者/测试员，或者你需要去争夺并得到更多的人员？你为你的商业伙伴安排的时间量怎么样？明白你有多接近这些目标能帮助你为下一个项目更好地分配资源，并且在下一个项目来临时为它设定更切实的预期。 <br />
<br />
　　预算——项目要花费多少？你是达到预算、未达到预算、超出预算？坐下来弄明白这些基本问题的答案会给你一些对任何项目临界区域的洞察力。 <br />
<br />
　　<strong>七、存档文档 <br />
</strong><br />
　　任何项目期间，好像我们都创建大量的文档。其范围可能从范围文档和项目计划到合同和会议纪要。不管是什么，在你结束时根据企业的保留策略应该有地方保存它们。当两年后你的电话铃响起来并且有人要你解释项目期间你所做的一个决定的背后原理时，你将会很高兴。 <br />
<br />
　　<strong>八、确保合同终止 <br />
</strong><br />
　　一个项目不常有自己的预算。你可能还有硬件、软件或专业服务的合同。在你完成以后，确认检查合同的所有项目都满足了，向供应商索要发票并把它们提交给 AP，并且关闭任何相关的财务帐目，如果需要的话。 <br />
<br />
　<strong>　九、举行一个验尸会议 <br />
</strong><br />
　　什么类型的风险你识别并减轻了？你想用以确保下次再做的什么真的变好了？和所有的项目利益相关者和有关参与者开个会，向他们提供了一个论坛来表述所学到的教训。 <br />
<br />
　　<strong>十、执行一个自我评估 <br />
</strong><br />
　　终于结束了。在所有的艰苦工作都完成以后，你已经确认所有的 i 都被加了点而且所有的 t 都加了横。现在做什么？从和你在项目中互动的人员那里得到一些关于你绩效的反馈是重要的。如果你有机会发一份360度反馈调查给尽可能多的个人，我建议你这样去做。这会帮助你评估你进步了多少并且能给你一些极大地提示来决定你该着眼于哪些个人成长的机会。 <br />
<br />
　　这个清单并不是对每个人都一样，并且根据你的组织和它如何部署项目会有不同。但如果你能够去做，它会永远使到下一个项目的过渡更顺畅。
<img src ="http://www.blogjava.net/maximo/aggbug/230940.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-09-24 17:23 <a href="http://www.blogjava.net/maximo/archive/2008/09/24/230940.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>管好资产生命周期价值链-SAP EAM</title><link>http://www.blogjava.net/maximo/archive/2008/09/23/230709.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Tue, 23 Sep 2008 09:00:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/09/23/230709.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/230709.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/09/23/230709.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/230709.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/230709.html</trackback:ping><description><![CDATA[<p><font size="2">在企业资产管理的实务中，我们经常会遇到资产管理与设备管理脱节的情况。负责实物的工程/设备/运行部门和负责价值的财务部门之间缺少协作，造成资产帐物不符。其典型表现如:基建工程竣工阶段的转固业务和设备新增业务各自操作，固定资产卡片和设备清册不一致;在资产更新变迁时资产台帐与设备台帐不同步更新，价值虚增虚减。管理上脱节带来的最直接影响就是企业资产的损失。笔者曾见过在一个大型集团企业清产核资的报告上，固定资产盘亏的损失超过了3个亿。如果建立起资产会计和设备实物的有效管理体系，同时二者又能够集成协作，即使不能根除盘亏的现象，带来的效益也仍然是可观的。本文围绕该主题，阐述SAP EAM方案中的主要作法，希望能对企业管理实务有所裨益。</font></p>
<p><font size="2">在SAP的EAM解决方案中，资产实物管理的负责部分前期是项目管理(PS)模块，后期是设备维护(PM)模块，而价值管理的负责部分是资产会计(AM)模块。这三大部分都建立在SAP统一应用平台基础上，数据模型共享，业务流程无缝闭环集成，能最大限度的保证资产帐物相符。</font></p>
<p><font size="2"><strong>1.从基建开始</strong></font></p>
<p><font size="2">在SAP的方案中，保证价值和实物统一的工作从基建项目就开始了。SAP的项目管理包含全面的项目计划和项目财务管理。设计阶段产生的设备清单会传入系统中，挂在项目的WBS结构下。每一设备的采购申请都会预先经过项目预算检查，然后形成设备采购订单。到货和已经安装的设备可以直接自动产生固定资产台帐，或者记入在建工程。工程部门或者财务部门根据规则创建好固定资产卡片，形成固定资产号，并建立设备清单和固定资产的映射关系。在项目从开始到结束的整个过程中，消耗的人、财、物等资源都按照工程结构和成本要素清楚分列。通过预先定义的结算规则进行自动结算，可以支持快速准确的转资，走出实现帐物相符的第一步。</font></p>
<p><font size="2"><strong>2.资产台帐和设备台帐的联动</strong></font></p>
<p><font size="2">在SAP EAM解决方案中，和实际业务一样，针对同一资产，存在侧重价值的资产台帐和侧重实物的设备台帐，二者的管理细度和口径的不尽一致。当在系统中创建新增的设备纪录时(如工程竣工时)，需要同时指定固定资产号。为了避免因为分类口径不一致而导致无法映射，首先需要保证设备和资产的分类有着严格的对应关系。通过设备编号和固定资产号之间的关联，设备台帐和资产台帐的共享信息可以保持一致，如所属公司、负责人、成本中心、位置等。保持一致的方式可包括实时的同步更新，以及通过工作流实现的可控异步更新。这样实物新增或者变更时，就能够及时地反应到资产台帐上。</font></p>
<p><font size="2"><strong>3.维修项目/工单的结算</strong></font></p>
<p><font size="2">设备的维护、修理和改造往往带来资产的价值变化，如果不能准确及时反映到资产台帐，就会造成价值的虚增虚减。SAP EAM系统中维修的主要管理工具是维修工单，对于复杂的大修技改，还需要应用项目管理模块。无论在维修工单还是维修项目中，系统都会详细计划并记录发生的物资消耗(载体为物料凭证)、投入的人力资源(载体为工票)以及所接收的外包服务(载体为服务确认单)，并在结算规则中指定对应的资产编码。一般情况下，在月末，系统可以自动地将记载在维修项目/工单上的价值变化进行批量结算，产生对应的记账凭证，更新资产帐。当出现误操作或者发现原始数据有误时，如发现物资发料数量记错，还可以取消某笔更新动作，待原始数据调整后再更新资产帐</font></p>
<p><font size="2"><strong>4.折旧、退役和报废</strong></font></p>
<p><font size="2">设备运行过程中需要记提折旧，折旧业务主要在资产会计模块中进行。当设备到了生命周期的后期，需要退役和报废时，可以先在设备维护模块中将设备置于退役或者报废状态，或者转移到报废区。这些调整动作可以作为事件触发预定义的后续工作流，启动资产报废的帐务处理，为资产帐物相管理画上一个圆满的句号。</font></p>
<p><font size="2"><strong>5.不实际的EAI策略</strong></font></p>
<p><font size="2">往往我们看到一家企业里面，设备维护系统和资产会计系统是独立的。这是因为传统EAM，包括目前市场上很多主流的EAM厂商，都不包含资产价值管理。针对这种情况，有些企业希望通过EAI集成平台来实现数据和流程的集成，而不采用统一应用平台的内嵌集成方式。从技术上来看，EAI集成是一种可行的方法，但实际操作性往往却不好。因为要做到实物和价值的真正一致，工作量和成本都会远远超出想象的规模。如果读者去那些宣传为实现了独立设备维护系统和财务系统无缝集成的个例看看，多半会觉得失望。</font></p>
<p><font size="2">根据SAP统计，设备维护和固定资产管理的接口点会有数十个，如系统逻辑名、法人结构、维护部门、工作班组、设备资产分类、台帐记录、凭证类型、科目映射等等。而且每一接口对象，都必须考虑到创建、更改、删除、撤销、更新失败等多种数据交换模式。从长期来看，不同系统的每一次升级都会带来接口调整甚至重做的风险。即使从成本角度考虑接口也不是一个可行的方案，美国的一个统计说明，一个接口的开发成本约为1万6到3万2美元，加上每年约4千到8千美元的维护成本。10个接口5年的成本最低为36万美元，已经是一笔可观的数目了。对于尚未部署EAM的公司来说，一定要从投入和效果角度分析清楚之后，再慎重的作出采用何种方式集成的决定。</font></p>
<img src ="http://www.blogjava.net/maximo/aggbug/230709.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-09-23 17:00 <a href="http://www.blogjava.net/maximo/archive/2008/09/23/230709.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>EAM 和ERP的融合是大势所趋???</title><link>http://www.blogjava.net/maximo/archive/2008/09/23/230700.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Tue, 23 Sep 2008 08:24:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/09/23/230700.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/230700.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/09/23/230700.html#Feedback</comments><slash:comments>1</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/230700.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/230700.html</trackback:ping><description><![CDATA[<p><font size="2">2004 年12 月31 日， 上海市电力公司、埃森哲公司和SAP公司在上海共同庆祝了上海电力SAP 系统的全面上线。今年5月，外高桥电厂也开始了SAP系统持续提升的进程。除了同样地处上海外，两家公司的一大共同点是都实施了融EAM和ERP于一体的SAP平台。和此两家公司类似的国内企业还有中国石化、浙江电力等。在特别注重设备管理的电力等资产密集型行业，经常会听见&#8220;EAM重要还是ERP重要&#8221;的争执。这一争执的声音将在不久的将来消失，因为EAM和ERP最终将合为一体，构成一个统一的管理系统平台，上篇文章提到的<a href="http://www.plant-maintenance.com/">www.plant-maintenance.com</a>网站所做的调研为一个佐证。</font></p>
<p><font size="2">为了避免引起混淆，这里将EAM定义为包含设备维护、采购管理、库存管理和项目管理等模块以资产维护为核心的管理系统。ERP方面则采用狭义的定义，即只包含人力资源、财务管理、物流和供应链等模块，以优化企业人财物资源为核心的管理系统。其实从结构上看，EAM和ERP就是无法截然割开的，采购管理、库存管理和项目管理是二者的交织处。管理套件供应商如SAP所提供的广义ERP系统里面，本身就完全涵盖了EAM的范围。在资产密集型行业，这种广义的ERP可以认为是一种&#8220;以资产为核心&#8221;的ERP系统，区别于一般制造业&#8220;以产品为核心&#8221;的ERP系统。</font></p>
<p><font size="2">EAM和ERP融合的首要因素在于&#8220;集成&#8221;的技术驱动。综观IT发展历史，我们看到集成控制了IT应用发展的主线。集成促进了MRP发展为ERP，也促进了CMMS发展为EAM。目前在有些资产密集型行业，系统建设的思路是分开建设EAM和ERP系统，然后通过点对点或者数据总线的方式实现接口。无论采用何种方式，接口的开发和维护总会带来大量的成本，同时降低了不同系统联动的效率。一般来说，需要实现的接口还往往比想象的要多。SAP进行过一个统计，仅仅在SAP的维修工单模块和财务模块之间，就存在着40多个内嵌接口点，来实现不同的数据传递和流程联动功能。不难判断，如果在两套独立的EAM和ERP系统之间特意实现这些接口，要么增加大量成本，要么只能实现部分影响整体效能。而在融合了EAM和ERP的应用平台中，自然就不存在这些问题。</font></p>
<p><font size="2">追求更好地管理资产是促进EAM和ERP融合的业务因素。在EAM和ERP割据的情况下，资产管理水平的提高受到很大的限制。首先就是实物和帐务的脱节：基建工程中发生的各项成本无法及时准确的结转到资产上；设备维修维护过程的价值变化难以更新到资产价值上去；设备台帐发生了移动变更而资产台帐却无反应。这些都直接或者间接造成了资产的损失。其次影响的就是设备管理工作的计划性。试想一下，如果维修人力资源和备件等物资在ERP系统内管理，EAM在做维修计划时如何有效保证资源的供应？割据带来的影响还包括很多，如无法建立计划、预算、控制和分析的全面维护成本管理体系。而在融合了EAM和ERP的一体化管理平台上，上述的这些限制和瓶颈都不复存在。</font></p>
<p><font size="2">除了技术和业务因素驱动外，市场土壤和环境的成熟也是不可忽视的一个因素。土壤是企业的内部条件，环境是市场上的实施顾问资源和行业榜样。国内许多企业，特别是资产密集型企业，总是担心自己内部的员工意识和素质是否能够承担一体化EAM和ERP带来的变革。这一点在经过多年信息化浪潮的洗礼，已经渐渐不再成为一个问题。如果考虑采用经过验证的、稳当的分步实施策略，更可以减少该因素的影响。通过多年来的应用实践，许多国际或者本地化的信息化咨询公司也积累了大量的经验，以及即懂EAM也懂ERP的人才，为提供一体化的实施服务建立了强有力的人力资源保证。国内的许多具有超前意识的企业也率先走出了这一步，树立了成功的榜样，如前文提到的上海电力和中国石化等。</font></p>
<p><font size="2">总而言之，根据IT发展的历史规律和目前先行者的成功实践来看，EAM和ERP必在不久的将来实现平台式的融合，为企业资产管理带来新的气象。</font></p>
<img src ="http://www.blogjava.net/maximo/aggbug/230700.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-09-23 16:24 <a href="http://www.blogjava.net/maximo/archive/2008/09/23/230700.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>以总成本理念贯串设备一生管理</title><link>http://www.blogjava.net/maximo/archive/2008/09/05/227229.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Fri, 05 Sep 2008 07:11:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/09/05/227229.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/227229.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/09/05/227229.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/227229.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/227229.html</trackback:ping><description><![CDATA[&nbsp;
<p style="line-height: 240%; text-align: center" align="center"><strong><span style="font-size: 14pt; color: #336699; line-height: 240%; font-family: 宋体">以总成本理念贯串设备一生管理</span></strong></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">&#8220;总成本&#8221;作为一种管理理念，应用在设备管理工作中，其实质就是对设备一生管理的全过程，即设备的设计、选型、采购、安装到投产、运行、维护、改造直至报废处置的寿命周期的各阶段，设备、生产、销售等各个部门，都能从企业的全局利益、总体效益出发，进行有效分析与控制，使企业投入的总体成本最经济，获得的效益最佳。推行&#8220;总成本&#8221;管理，在最大程度地为企业创造效益的同时，也为用户创造了价值，满足了用户的需要，进而增强了宝山钢铁股份有限公司的竞争力。因此，推行&#8220;总成本&#8221;管理成为宝钢公司&#8220;建成全球最具竞争力钢铁企业&#8221;战略目标的具体体现与重要措施之一。在宝钢公司，这一理念提出已近两年，通过在设备管理实践中落实、推广和应用，现已取得了初步成效。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">一、强化设备前期管理是实现&#8220;总成本&#8221;理念的基础</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">设备的前期管理是设备投产前的管理，设计、选用什么样的设备，对投产后企业经济效益、设备维护费用起着决定性的作用。所以，要实现设备一生投入的&#8220;总成本&#8221;最经济或产出最佳，有必要从设备的形成阶段，即从设计、选型，安装和调试开始统筹考虑，科学、系统地研究&#8220;一次性投入&#8221;与&#8220;经常性投入&#8221;的内在规律。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">合理设计、科学选型是&#8220;总成本&#8221;理念在设备前期管理中的突破口</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">宝钢公司自</span><span style="font-size: 12pt; line-height: 240%">2001</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年在设备部成立建设工程&#8220;设备管理准备室&#8221;以来，将&#8220;总成本&#8221;的理念融入到设备前期管理之中。各职能部门打破了部门的分工界限，负责设备前期管理的投资、设计和工程施工的职能部门与设备维护部门紧密结合，在对宝钢公司一、二、三期</span><span style="font-size: 12pt; line-height: 240%">11</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">个生产单元，机、电、仪等</span><span style="font-size: 12pt; line-height: 240%">7</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">个专业充分调研的基础上，颁布了《宝钢公司工程建设项目设备选型的基本原则和标准》，制订了</span><span style="font-size: 12pt; line-height: 240%">574</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">项技术规程和</span><span style="font-size: 12pt; line-height: 240%">601</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">项技术标准，编撰完成了《设备设计规范》中的通讯设备篇、电气设备篇。从设备的可靠性、可用性、维修性、安全性等各方面进行了统筹考虑，为设备后续的生产、运行维护的经济性打下了良好的基础。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">设备前期的合理投入有利于降低设备运行的维护成本</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">在传统的设备管理中，设备前期管理与运行管理常有脱节现象发生，因此有时设备刚投运，就会产生改善、改造项目，造成既影响生产，又增加投入的现象。为此，宝钢公司设备系统积极推行运行维护与前期设计、投资控制相结合的管理，调查、整理了部分工程项目为节约投资而导致运行过程投入更多资金的案例，提交给基建部门，使基建部门在降低单项工程造价和工程建设费用时，不再把降低项目建设投资作为追求的唯一目标。这样前期投入不一定节约，但总体投入减少。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">针对基建随机备件订购中暴露出的&#8220;订的不用、用的没订&#8221;等现象，设备维护部门主动提供无库存备件消耗清单和以往各设备一年随机备件的消耗实况，积极参与随机备件的订购管理，保证了投产前期随机备件订购计划的合理性，避免了备件资金积压。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">二、控制设备运行过程中的投入和追求投入产出比最经济，是实现&#8220;总成本&#8221;理论的核心与关键</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">宝钢公司设备系统近两年来通过优化维修费用预算管理方式、控制物料（备件和非生产性材料）消耗、优化检修模式、降低检修外协费用等多种方法，有效地控制了设备维修费用的投入。同时，设备系统加强了投入产出的分析，加大了效益显著的项目的投入。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">采用&#8220;标准</span><span style="font-size: 12pt; line-height: 240%">+</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">&#945;&#8221;预算管理，是控制维修费用&#8220;总成本&#8221;的有效方式</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年宝钢公司设备系统创造性地将标准成本的管理方式与设备维修的特点相结合，推出了&#8220;标准</span><span style="font-size: 12pt; line-height: 240%">+</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">&#945;&#8221;的预算管理方式，这是维修费用精细化管理的具体措施。&#8220;标准</span><span style="font-size: 12pt; line-height: 240%">+</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">&#945;&#8221;的实质就是根据历年的维修费用实际情况，将每年必须投入的基本的维修费用作为&#8220;固定成本&#8221;，而将</span><span style="font-size: 12pt; line-height: 240%">10</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元以上的物料消耗及其它新增项目消耗，作为&#945;部分即&#8220;变动成本&#8221;。为有效控制&#945;部分的投入，在推行预知状态维修的基础上，对&#945;部分按项目进行管理。该方式的实施，有效地提高了维修费用管理的准确性与可控性。</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年上半年设备维修费比上年同期下降了</span><span style="font-size: 12pt; line-height: 240%">13.23%,</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">其中&#8220;&#945;&#8221;项目占下降额的</span><span style="font-size: 12pt; line-height: 240%">55%</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">采用备件无库存、按性能价格比采购和非生产性材料集中管理是降低维修成本的主要手段</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2001</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年宝钢公司物料消耗占维修成本总额的</span><span style="font-size: 12pt; line-height: 240%">69%,2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年设备系统把有效降低物料消耗作为控制设备维修成本的重点工作。截止</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年</span><span style="font-size: 12pt; line-height: 240%">6</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">月</span><span style="font-size: 12pt; line-height: 240%">30</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">日</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">已完成无库存备件</span><span style="font-size: 12pt; line-height: 240%">52</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">项，降低消耗</span><span style="font-size: 12pt; line-height: 240%">300</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元。备件（含新品和修复）按性能价格比采购</span><span style="font-size: 12pt; line-height: 240%">187</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">项，设备系统改变了价格是选购备件唯一标准的观念，部分备件采购单价虽略有上升，但与上年同期相比，备件的实际总体消耗却明显减少，因此而节约的采购资金达</span><span style="font-size: 12pt; line-height: 240%">200</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">余万元；在备件新品采购与修复时，采用了竞标方式，其中仅冷轧聚胺脂辊修复一项，累计降低成本</span><span style="font-size: 12pt; line-height: 240%">2493</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元；非生产性材料领取的原流程是生产厂申请，采购部门审批采购发送，现改为用户申请后由设备部审核，再交采购部门采购。由于对申购计划进行了集中管理，杜绝了申请物料&#8220;此路不通，改道走&#8221;的现象，使宝钢公司</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年</span><span style="font-size: 12pt; line-height: 240%">1-7</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">月份非生产性材料消耗同比下降了</span><span style="font-size: 12pt; line-height: 240%">6917.55</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元。</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年上半年物料总消耗在维修成本中的比例下降到</span><span style="font-size: 12pt; line-height: 240%">59%,</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">比上年下降了</span><span style="font-size: 12pt; line-height: 240%">10</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">个百分点。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 3.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">降低设备停机时间是降低&#8220;总成本&#8221;的有效措施</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">近年来，宝钢公司设备系统强化了&#8220;设备综合效率&#8221;的应用、分析工作，取得了明显的成效。通过优化检修模式，</span><span style="font-size: 12pt; line-height: 240%"> 2000</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年至今，公司有</span><span style="font-size: 12pt; line-height: 240%">34</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">个单元（机组）延长了定（年）修周期。其中仅</span><span style="font-size: 12pt; line-height: 240%">2030</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">冷轧</span><span style="font-size: 12pt; line-height: 240%">CM02</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">机组定修周期从投产初期的每周</span><span style="font-size: 12pt; line-height: 240%">1</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">次</span><span style="font-size: 12pt; line-height: 240%">16h,</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">压缩到两周</span><span style="font-size: 12pt; line-height: 240%">1</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">次</span><span style="font-size: 12pt; line-height: 240%">16h,</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">直至现在的</span><span style="font-size: 12pt; line-height: 240%">1</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">个月</span><span style="font-size: 12pt; line-height: 240%">1</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">次</span><span style="font-size: 12pt; line-height: 240%">20h,</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">仅此一项压缩检修时间</span><span style="font-size: 12pt; line-height: 240%">528h/a </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">。经统计，</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年</span><span style="font-size: 12pt; line-height: 240%">1-6</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">月全公司&#8220;设备综合效率&#8221;平均比上年同期提高</span><span style="font-size: 12pt; line-height: 240%">5% </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">。</span><span style="font-size: 12pt; line-height: 240%">1550</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">冷轧机组按</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年计划产量、单价、成本计算，&#8220;设备综合效率&#8221;提高</span><span style="font-size: 12pt; line-height: 240%">5% </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">，单位产品成本平均下降</span><span style="font-size: 12pt; line-height: 240%">1.1%</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">，税前利润相应可提高</span><span style="font-size: 12pt; line-height: 240%">33.3% </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 4.</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">打破&#8220;本位主义&#8221;，树立设备管理工作为企业创更大效益的服务观念</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">只要产出大于投入，能给公司带来更大效益，即使可能突破预算，面临考核，也要坚决投入。</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年热轧加热炉、初轧均热炉采用节能涂料，需增加计划外预算</span><span style="font-size: 12pt; line-height: 240%">324 </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元，但年产生效益可达</span><span style="font-size: 12pt; line-height: 240%">620</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元，投入产出比为</span><span style="font-size: 12pt; line-height: 240%">1:1:9</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">，设备部、热轧厂、条钢厂一致支持了该项目的实施。电炉管连铸虽增加了</span><span style="font-size: 12pt; line-height: 240%">01</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">水系统设备需投入</span><span style="font-size: 12pt; line-height: 240%">35</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元，但年节水降耗达</span><span style="font-size: 12pt; line-height: 240%">99</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">万元，投入产出比为</span><span style="font-size: 12pt; line-height: 240%">1:2.8</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">，该项目现已完成投运。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">三、盘活闲置设备和提高退役设备处置收益率是&#8220;总成本&#8221;理念的深化和发展</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">通过加大技术投入达到增加设备寿命后期阶段收益的目的。在处置</span><span style="font-size: 12pt; line-height: 240%">1</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">台退役的空分设备时，宝钢公司通过向买方提供空分设备的安装、调试、运行软件以及维护保养技术，一台空分设备的处置收益比设备净值高出了</span><span style="font-size: 12pt; line-height: 240%">500</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">多万元。宝钢公司通过改进闲置、报废设备的处置方式，</span><span style="font-size: 12pt; line-height: 240%">2002</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">年上半年</span><span style="font-size: 12pt; line-height: 240%">25</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">台闲置、报废设备的处置收益比原处置方式报价提高</span><span style="font-size: 12pt; line-height: 240%">14.4%</span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">。</span></p>
<p style="line-height: 240%; text-align: left" align="left"><span style="font-size: 12pt; line-height: 240%">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span><span style="font-size: 12pt; line-height: 240%; font-family: 宋体">&#8220;总成本&#8221;管理理念是当今先进的管理思想之一，通过在设备管理实践中的应用，已取得了初步成效。这一思想理念有利于克服按部门职能分工、按部门业绩考评造成的&#8220;本位主义&#8221;、&#8220;短期行为&#8221;、&#8220;短视行为&#8221;等弊端，有利于引导公司各级管理人员从大局出发，一切以公司效益最大化为目标指导当前及今后的工作。</span></p>
<img src ="http://www.blogjava.net/maximo/aggbug/227229.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-09-05 15:11 <a href="http://www.blogjava.net/maximo/archive/2008/09/05/227229.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>企业资产管理中的差异分析和分摊</title><link>http://www.blogjava.net/maximo/archive/2008/09/05/227225.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Fri, 05 Sep 2008 07:05:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2008/09/05/227225.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/227225.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2008/09/05/227225.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/227225.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/227225.html</trackback:ping><description><![CDATA[&nbsp;
<p style="line-height: 150%; text-align: left" align="left"><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">只要成本模块采用标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">必定产生差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">差异分析的目的是找到管理漏洞，做到事中控制，可将</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">ERP</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的差异来源分成以下几类：</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
</span><strong><u><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">&nbsp;1.</span></u></strong><strong><u><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">物料移动发生的价差</span></u></strong><strong><u><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:</span></u></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(a).MIGO PO</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">收货时</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">采购价格和标准价格不同产生差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(b).MIRO</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">后勤发票检验时由于价格变更会产生差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(c).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">物料转移过帐</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> 311/309</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">由于两边价格不一产生差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(d).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">初始化库存差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">其它移动类型产生的差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(e).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">来料加工等库存到自由库存产生差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;(f).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">退货时差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
</span><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">&nbsp;2.</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">发票价格差异和汇率差异</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">发票校验由于价格变更会产生价格差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">;</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">跨期产生暂估和实际之差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">;</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">外币采购因为汇率变化引起的差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">SAP</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">将收货到发票校验这段时间的汇率差异和材料差异同样处理</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">实际上</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">你也可将默认识的汇率差异直接也设置成材料采购差异</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">而</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></em><em><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span></em><em><u><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">发票校验后产生的应付因汇率变化在期末外币重估时产生的差异则视为汇兑损益</span></u></em><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">&nbsp;3.</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">重估库存和价格差异</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;MR21/MR22, CKMPRPN/CKME</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">价格变更产生的差异，启动物料分类帐后，系统为了保持期间数据的一致，采用标准价的物料如果有交易一般不再允许修改单价。</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
</span><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">&nbsp;4</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">．生产成本结算差异</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
&nbsp;</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本结算差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> = </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本投入</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">-</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本产出</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> <br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">在结算前</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">往往计算生产成本差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:<br />
&nbsp;</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本结算差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> = ( </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本投入</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">-</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">目标成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">a) - (</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本产出</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">-</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">目标成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">b)<br />
</span><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">目标成本</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">a</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> (</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">标准成本估算成本部件累计方</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">) = </span><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">目标成本</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">b</span></strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> (</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">), </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">同一期内</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品的标准成本正是标准成本估算后</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">各成本部件的层层上卷累加</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生成产本投入包括各成本部件的投入</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">原料辅料</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">人工机器折旧</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">通过实际生产成本的投入和目标成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">a</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的比较</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">得到所谓的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">种类差异类型</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">正好可以分析到所谓的直接材料成本差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">实际材料成本和标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">a</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">中的材料标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">和直接人工成本差异等</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">你可将系统默认的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">种差异细分成你所需要的差异分析类别</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">这取决于你定义成本部件的明细程度</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">系统最多允许定义</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">40</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">个成本部件</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">你将这些成本对应到获利分析模的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">40</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">个值字段</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">从而在差异计算后将实际成本部件传到获利分析</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,&nbsp; </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">实际上，财务模块并不反应这些差异明细</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">只是才成本分析模块中体现</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">这就是将财务和成本模块分开的好处避免产生一大堆垃圾财务凭证</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,&nbsp; </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">差异在向财务过帐时是以一个总的</span>&nbsp;<span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本结算差异过帐的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">举一个简单实例</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品标准价</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">968</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">元</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">/</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">个</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">其中原料</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">950</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">元</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">人工</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">元</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">折旧</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">元</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">本期生产该产品</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">10000</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">个</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,&nbsp; </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">平时</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">原料以标准价投入了</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">1000</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">假设标准成本估原料是</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">950</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">), </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">人工和机器折旧各以作业类型计划价的方式投入各</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">10</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">标准成本估算值为</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">),</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品以标准价收货</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">910000</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">个</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">968</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">期末结帐成本中心分配分摊作业实际价格重估重估工单一般就这些操作而已</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">人工和机器折旧的实际价格各为</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">12</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">此时计算差异得到</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:<br />
</span><u><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">原料差异</span></u><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">: 1000</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> -&nbsp; 950 </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> = 50</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">由于多投入原料</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产生</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">50</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万数差</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)<br />
</span><u><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">人工差异</span></u><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:&nbsp; 12</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">实际作业价</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)- 9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> = 3</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">假设全为价差</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)<br />
</span><u><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">折旧差异</span></u><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">: 12</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">实际作业价</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)--9</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">=3</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> (</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">假设全为价差</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)<br />
</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">总共产生的实际生产成本投入为</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">:1024</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">借方</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">!,</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">这些类型差异反应在成本模块中</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">可以进行分析</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">.<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">工单入库凭证为</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:<br />
Dr:</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品库存</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">&nbsp; 968</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
&nbsp; Cr:</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本产出科目</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(Tcode:OBYC-&gt;GBB/AUF)&nbsp; 968</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">总共产生的实际生产成本产出为</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">:968</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">贷方</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">!</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">工单结算凭证为</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">:<br />
Dr:</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> 56</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">反应在物料分类帐中</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,CKM3</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">可查看</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">)<br />
&nbsp;&nbsp;Cr :</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产成本结算差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> 56</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">(Tcode:OBYC-&gt;GBB/AUF)<br />
&nbsp;</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">生产成本结算差异</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana"> 56</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">万</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">贷方</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">! </span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">总的</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">56</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">万一笔反应在财务模块</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana">.</span></p>
<p style="line-height: 150%; text-align: left" align="left"><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">实际生产成本投入</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana"> =&nbsp; </span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">实际生产成本产出</span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: Verdana"> +&nbsp; </span><span style="font-size: 8pt; color: fuchsia; line-height: 150%; font-family: 宋体">生产成本结算差异</span></p>
<p style="line-height: 150%; text-align: left" align="left"><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">如果你细心</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">就会发现</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">无论是原料还是产品</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">此时都还是标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">接下来可以使用物料分类帐将差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">分摊出去还原实际成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">. </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">对产成品</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">因为平时收发货都是标准成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">那么生产成本差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"> 56</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">万将在销售发货和</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">期末库存间分摊</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">对于原料同样采购差异在消耗和期末库存间分摊</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">不同的是</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">原料的消耗是往上层层上卷到半成品和产品的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">这就是所谓的</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">多层差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">", </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">如果</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">BOM</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">层次较多或象流程行业出现物料汇流的循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">BOM,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">多层次差异就会耗费相当长的时间才能计算出</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
<br />
</span><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">如果仅仅从财务核算角度</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">国内</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">ERP</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">更愿意采用期末统一核算出成本</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,,</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">但是这种</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">事后</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">核算的方式</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">外界评论是不能合理反应出</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">成本管理</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的思想</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">不能作到事前预测</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">事中核算</span></strong><strong><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.</span></strong></p>
<p style="line-height: 150%; text-align: left" align="left"><strong><u><span style="font-size: 8pt; color: red; line-height: 150%; font-family: 宋体">合理优化业务</span></u></strong><strong><u><span style="font-size: 8pt; color: red; line-height: 150%; font-family: Verdana">,</span></u></strong><strong><u><span style="font-size: 8pt; color: red; line-height: 150%; font-family: 宋体">避免物料分类帐运行时间过长</span></u></strong><span style="font-size: 8pt; color: red; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">是在多层差异分配上</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">多层差异的产生的主要方式有</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">3</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">大类</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
(1).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">跨工厂的转储</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">301/302,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">比如产品从生产工厂到销售工厂使用</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">301,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">则销售工厂到</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">生产工厂规定只能使用</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">302,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">否则同期销售工厂到生产工厂也使用</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">301,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">则多层差异分</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">配死循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">荆门不存在这种业务</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
(2).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">物料</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">309/310</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">转移</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">经检查发现重污油</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">309 68324006-</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">》半沥青</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">68324032</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">使用了</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">3<br />
09,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">而半沥青</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">68324032</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">转回</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">-</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">》</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">重污油</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">68324006</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">也使用了</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">309(</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">原则上应该使用</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">310),<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">也造成了死循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,&nbsp; 309/310</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">物料转移的方式可以规范</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">尽量避免多层差异循环分配</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
(3).</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产品回流循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">BOM</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">造成的循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">假设消耗</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">A+B+C</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">产出</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">X,Y,Z, </span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">而消耗</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">X</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">又产出</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">A,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">则</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">A<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的多层消耗差异将分配到</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">X</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">作为接收方差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">, X</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的消耗差异又转回</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">A</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">作为接受方差异</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,<br />
A(X)</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的本期期初</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">+</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">接收差异又在</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">A(X)</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的本期消耗和期末库存分配</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">这样就造成循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
&nbsp;<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">对于中间环节半成品过多的企业，如果半成品不需要进行库存管理或核算</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">可以考虑设置虚拟物料的方式</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">一</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">规范</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">309/310/311/312</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">业务</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">坚决避免造成多层差异死循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.<br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">二</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">.</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">优化循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">BOM</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的结算规则</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">考虑将产量不多或核算无</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">精确</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">"</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">要求的造成循环回流</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">的联产品设置成副产品或固定价扣除</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">直接扣除生产成本</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">而不是参与生产成本的权</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana"><br />
</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">数分摊</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">,</span><span style="font-size: 8pt; line-height: 150%; font-family: 宋体">避免多层差异分摊时循环</span><span style="font-size: 8pt; line-height: 150%; font-family: Verdana">!</span></p>
 <img src ="http://www.blogjava.net/maximo/aggbug/227225.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2008-09-05 15:05 <a href="http://www.blogjava.net/maximo/archive/2008/09/05/227225.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>EAM与企业维修成本管理(Relationship Of EAM and Cost Management of Asset Maintaince) </title><link>http://www.blogjava.net/maximo/archive/2006/08/16/63848.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Wed, 16 Aug 2006 03:31:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2006/08/16/63848.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/63848.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2006/08/16/63848.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/63848.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/63848.html</trackback:ping><description><![CDATA[&nbsp;
<p><strong><span style="font-size: 12pt; font-family: 宋体">EAM</span></strong><strong><span style="font-size: 12pt; font-family: 宋体">与企业维修成本管理（李艳芬）</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; color: #081c6f; font-family: 宋体">摘要：成本控制是每个企业的重要管理内容，对那些资产密集型企业会是怎么一种情况呢，在该类企业中那些需要更多部分，以及如何可以通过EAM提升包括财务管理的相关管理呢。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; color: #081c6f; font-family: 宋体">cost control&nbsp; is the most important part of ervery enterprise ,how about the in the type of asset_ intensive&nbsp; enterprise. What should be pay more heed to in these enterprise andhow can they improve the related management including the finace management via the EAM(enterprise Asset Managemnet).</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">1</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、 资产密集型企业的成本控制重点</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">财务管理是企业管理的重要组成部分，会渗透到企业生产的各个领域和环节；而成本控制又是财务管理当中的重中之重。但不同性质的企业，由于不同经营活动在企业中所占的成本比率十分悬殊，因而对于成本控制的对象、方法和思路不同；对于资产密集型企业，提高维修管理水平，控制好维修成本是提高企业财务管理的关键所在，因此对于这类企业的管理思路是：通过维修管理带动财务成本管理，因而实现公司的战略管理。这种企业的这种管理思路是由这类企业的特征决定的：</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">1</span><span style="font-size: 10pt; font-family: 宋体">）这类企业像是用黄金堆起来的企业，资产高度密集。主要特点为要么设备资产数目庞大、种类繁多或者每台设备的资产价值高。比如说，一家火电厂的设备的数目就有数万个，甚至几十万个，设备的种类也有几百类；对于露天矿的一个调度铲就几千万美金，甚至是一个卡车轮台也有几十万，就是对于铁路公司，一个牵引机车也是几千万。<br />
2）资产设备特别先进、生产自动化高，对人的依赖程度比较低，但对维修保养的要求比较高，对维修管理要求水平要求比较高。而设备的可靠正常运行是企业利融来源和企业战略发展的根本保证，所以维修成本高。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">3</span><span style="font-size: 10pt; font-family: 宋体">） 同其运营管理的成本相比，资产管理的成本所占比例非常高。矛盾无时不在，矛盾无处不在，但矛盾有大小之分，主次之分，所以有时需要抓大放小，只有把主要的矛盾抓住了，才能牵一发而动全身，才能根治问题；而对于资产密集型企业，维修成本控制得好坏反映了该企业的财务管理中的成本控制的好坏，体现着企业的管理水平。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、 EAM系统与维修成本控制的关系</span></strong></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">．1维修成本的控制的难点：</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">既然维修成本是资产密集型企业的成本控制的关键，那么如何控制该类企业的成本的呢？该类企业维修存在以下管理难点：1、生产是第一位的。可靠性生产是企业的根本要求。为了保证设备维修的需要，有些关键设备或配件，就不能按照零库存的管理思想去管理，就可能需要一个领两个，也就是不怕一万就怕万一。2、资产设备数目庞大，到底那些是需要多储备的，这肯定有一个规律，但因为数目庞大，搞清楚这个规律不容易。3、对于操作人员，是不是根据实际生产去领料呢（比如说真是因为设备需要这么多配件呢），还是因为个人的一点使用方便，往往以领代耗，造成很多的账外料。4、对于那些消耗的维修成本比其生产价值都大的设备，因为数量多，是不是该报废难以确定。5、对于维修当中的维修方法难以去考究，是否不科学的维修而造成故障频发，从而造成了设备维修成本的提高。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">概括起来应该有，有这样的特点及设备多，对应的配件根多，所以管理起来困难，没有精确管理就很能做到科学的成本分析。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">&nbsp;2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">．2 EAM的精细化管理：</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">EAM</span><span style="font-size: 10pt; font-family: 宋体">是以资产、设备台帐为基础，以工作单的提交、审批、执行为主线，按照缺陷处理、计划检修、预防性维修、预测性维修几种可能模式，以提高维修效率、降低总体维护成本为目标，将采购管理、库存管理、人力资源管理集成在一个数据充分共享的信息系统中，同时实现信息集成和规范化管理相结合。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">EAM</span><span style="font-size: 10pt; font-family: 宋体">的功能：用计算机系统，辅助企业管理有形资产(如生产设备、厂房设施、交通工具、仪器仪表、工具以及包括一些图纸、文档、经验)，生产危害、预防措施等，总之，资产管理系统管理范畴覆盖了和维修相关的所有因素，管理对象很明确，是一种管理专业性很强的系统。</span></p>
<p><span style="font-size: 10pt; font-family: 宋体">工单管理系统是EAM系统一个核心模块，它是将采购和库存连接起来的一个桥梁。&nbsp;工单管理系统要求：无论是普通的事故报告，还是紧急抢修，或者计划性的维护，其所有信息都应该保证完整的记录在工单中，包括所需员工的技能、工具、计划的工作时间，实际发生的工时，安全措施，还有工期进度，物料消耗等等。每个工单都记载了具体设备具体维修的维修对象、维修人员、维修工具、维修消耗物料，同时也能够统计每次具体维修的维修成本。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">因为通过EAM系统能够经数目庞大的设备、配件、维修内容等等都管理起来，因而能够做到自残管理的精细化。这种精细化管理解决了资产维修成本控制的各种难题：1、计算机管理使非常多的对象都能做到信息清晰共享，并能够方便的查询。2、通过单机定额消耗等统计工作，可以比较科学的确定，合理维修应该有多大的库存是比较合理的，解决很多问题生产单位与采购部门都摸不准的问题3、通过在使用部门增设箱柜，对于没有用完的物料要求及时退库或做箱柜转移，就避免了因为以领代耗所引起的成本不真实。4、对于设备配件消耗的不断地分析，就可以分析出该设备的适用价值，而不会出现，因为有需要报废的设备而引起成本增加。5、对于维修方法不断的维修，需要做成标准体系的，就做成标准体系，这样就做到了维修方法的科学化管理，减少因为维修不当而引起的成本消耗。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">&nbsp;2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">．3 通过该系统控制维修成本的基础工作：</span></strong></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">1</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、基础数据要齐全、完善。</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">基础数据工作是资产管理的一个基础工作，基础工作的好坏直接影响以后工作的质量。EAM系统要求物资、设备、位置、故障体系、安全体系、员工、工种、工具等等，所有需要进入系统的数据都要做一个标准化的体系。标准化的目的，就是消除歧义，如果有歧义就影响各种分析，消除了企业才能做到精确分析。其实在资产管理系统地实施中，有这样的一句话，三分技术、七分管理、十二分数据，强调了基础的重要性，实际上在实施过程中再怎么强调基础数据的重要性都不为过。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">因为成本分析需要分析和统计是建立在这个基础工数据作之上的。所以基础工作对成本分析的应用所起的作用是前提和基础。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、维修内容要真实。</span></strong><span style="font-size: 10pt; font-family: 宋体"> <br />
&nbsp; <br />
EAM</span><span style="font-size: 10pt; font-family: 宋体">系统要求凭单领料，也就是说有了维修需求或者有了维修任务才允许领料。不能够允许出现为了领料而领料的工单。如果做不到这点，这样就不能够将物料消耗对应到相应的设备或维修对象，这样会造成因为工作方式的问题而影响到了单机消耗的统计的准确性。因此，按照系统的要求认真正确的填写维修信息也是做好动态数据的工作的基本要求，也是展开分析工作的前提。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">其实，EAM是一个基础工程，系统给资产管理或者成本分析提供了先进的管理理念和管理方法和思路，但是，计算机系统毕竟是由人来操作，所以需要操作人员能够按照要求认真地操作，因此相关的管理制度和管理模式的改变对系统管理思想的应用是必不可少的。在笔者的实施经验中，存在这样的这样的情况：1、使用人员对系统有抵制思想，精细化管理有时会带来一点工作量，但最主要的是哟要求使用人员学习新的东西。2、相关的管理力度跟不上，就会造成使用人员的应付行为，造成录入成本数据的不真实性，成本数据张冠李戴或者是没有。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">3</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、 及时的处理采购与发料。</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">因为EAM系统是一个信息集成的系统，它把维修任务、库存采购、计划供应、人力资源等系统都集成为一个主体。这样就要求企业的各个业务部门能够协调一致，每个部门都需要高效、快捷的完成自己的业务才不会影响其他部门的业务。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">成本核算工作与采购业务关系密切，如果所需物质没有及时采购、或者采购在途或已经到货导致没有入库或不能及时入库，就会影响到物料发放，不能够将库存物资和设备实际消耗对应起来，从而影响到系统的成本实时分析，造成成本分析的重大偏差。</span></p>
<p style="text-align: left" align="left">&nbsp;<span style="font-size: 10pt; font-family: 宋体">也就是说，财务核算、财本分析是一个整体，不仅仅是财务部门和维修部门的事，供应仓促部门的工作也是成本分析的前提和基础。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">4</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">、形成足够多的历史数据。</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">EAM</span><span style="font-size: 10pt; font-family: 宋体">系统的引进的是先进的管理思想，然而对管理的提升、对管理的决策的有力支持需要建立在翔实的数据积累之上，在日常维修工单高质量完成基础之上，并经过一定时间的积累，就能够分析管理对象的相关信息和数据，通过分析单台设备或者是关心对象的成本消耗趋势等，提取有益的信息。历史数据形成的过程就是维修水平的记录过程，通过数据的挖掘、提取、分析、对比，将成本管理的黑洞变成数字化的管理。成本消耗数据越是积累，成本分析价值越大。 </span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">．4、成本核算的层次：</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">成本核算的实现应该根据具体情况分为几个层次去完成提升：1、和以前系统的衔接，特别是对于那些停留在手工模式的，就需要用eam系统能够打出成本核算的各种单据。诸如接收单、领料单、发票、物质核算单、入库金额汇总等。因为财务核算是以凭证为基础的，在没有新的更为先进的核算体系和模式，那么就要能够满足财务对生成凭证的要求。这也是最基本的要求。2、在能够完成本核算基本要求的基础上，</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">就可以开发、定制模块进行多层次、多对象的成本分析。因为对于企业当中的不同人员和部门，他们说关心的财务信息不一样。对于生产部门可能最关心的是会不会发生赤字，而对于管理部门可能更多关注整体财务运营状况。通过维修任务所对应的不同级科目或其组合，或者再加上对维修任务相关的部门、时间段等条件的查询，能够得到具体部门所需要的有用的财务数据。3、当以上的成本核算和分析的目标达到后，就应给考虑成本核算集成化的功能。将维修的财务信息，通过接口程序，生成电子凭证，让后直接的导入到财务系统，实现成本消耗和财务核算的一体化，满足财务管理成本核算的各种要求。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">2</span></strong><strong><span style="font-size: 10pt; font-family: 宋体">．5成本分析对维修经营的指导：</span></strong></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">对于维修企业，成本控制的重点在维修成本控制，那么就需要成本控制能够从维修中来，又能够返回到维修任务当中，对维修工作产生指导意义。因为通过eam系统能够将维修的各种因素集成为一个整体，那么就能够将成本消耗和成本消耗的原因对应起来，找出维修当中对消耗成本的影响重大的因素，保留合理的，剔除没有必要的。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">事实上，资产的维修策略、维修方法、维修环境、维修人员、维修工具等，都会对设备维修质量产生重大的影响，最终影响到维修成本。通过维修成本的分析，能够让管理人员关联到这些因素。所以说，故障分析和成本分析，最终是彼此依赖相互支撑。</span></p>
<p style="text-align: left" align="left"><span style="font-size: 10pt; font-family: 宋体">合理的成本分析导致维修资金的合理分配，合理的分配会带动维修设备的整体的性能、和可靠性的增加，从而减少事故，也就减少了维修，从而就降低了维修成本。</span></p>
<p style="text-align: left" align="left"><strong><span style="font-size: 10pt; font-family: 宋体">结束语：</span></strong></p>
<p><span style="font-family: 宋体">对于资产密集型企业来说，管好了资产，也就是管好了企业发展的根基。然而，这类企业资产管理面临资产数量、备品、配件数量庞大，</span><span style="font-family: 宋体">对资产管理以及成本控制提出了挑战，</span>eam(<span style="font-family: 宋体">资产管理系统</span>)<span style="font-family: 宋体">专门是解决这些问题的系统。系统能不能用好，和实施方法、应用质量、管理模式都是密不可分的。实施好系统，应用好系统，提升维修管理，是成本分析和财务管理的前提条件；即基础工作做扎实，管理和分析效益才能得以体现。</span></p>
<img src ="http://www.blogjava.net/maximo/aggbug/63848.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/maximo/" target="_blank">雅典一休</a> 2006-08-16 11:31 <a href="http://www.blogjava.net/maximo/archive/2006/08/16/63848.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>全面规范化生产维护(total normalized productive maintenance_TNPM)</title><link>http://www.blogjava.net/maximo/archive/2006/08/08/62378.html</link><dc:creator>雅典一休</dc:creator><author>雅典一休</author><pubDate>Tue, 08 Aug 2006 08:50:00 GMT</pubDate><guid>http://www.blogjava.net/maximo/archive/2006/08/08/62378.html</guid><wfw:comment>http://www.blogjava.net/maximo/comments/62378.html</wfw:comment><comments>http://www.blogjava.net/maximo/archive/2006/08/08/62378.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/maximo/comments/commentRss/62378.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/maximo/services/trackbacks/62378.html</trackback:ping><description><![CDATA[
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">作者提出<span lang="EN-US">“</span>全面规范化生产维护<span lang="EN-US">”</span>管理模式<span lang="EN-US">??TNPM</span>（<span lang="EN-US">Total Normalized Productive Maintenance</span>）<span lang="EN-US"> [1] [10], </span>引起了不少企业的关注，山东颐中集团荷泽卷烟厂、<span lang="EN-US"><a href="http://www.sogou.com/sogoupedia?query=秦皇岛" target="_blank"><span lang="EN-US"><span lang="EN-US">秦皇岛</span></span></a></span>戴卡轮毂有限公司、鞍钢集团、青藏铁路工程、珠海移动通讯有限公司等在本企业自主展开<span lang="EN-US">TNPM</span>推进。<span lang="EN-US">TNPM</span>是以设备综合效率和完全有效生产率为目标，以全系统的预防维修体系为载体，以员工的行为规范为过程，全体人员参与为基础的生产和设备系统的维护、保养和维修体制。<span lang="EN-US"><?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" /?><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">中国推行全面生产维护<span lang="EN-US">??TPM</span>（<span lang="EN-US">Total Productive Maintenance</span>）的难点是<span lang="EN-US">“</span>全员参加<span lang="EN-US">”</span>。与日本相比，为什么在中国企业安装<span lang="EN-US">TPM</span>会更困难？因为文化与传统不同，企业员工平均文化水平不同，习惯和素养不同。中国员工的缺点是：<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">1) </font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">做事随意，没有规矩</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">2) </font>
						</span>
						<font face="宋体">有了规矩，弄虚作假，不守规矩</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">3) </font>
						</span>
						<font face="宋体">遵守规矩，却总是做不到位<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">中国企业成功的<span lang="EN-US">TPM</span>，应回答好三个问题：即<span lang="EN-US">“</span>员工素质行不行？<span lang="EN-US">”</span>，<span lang="EN-US">“</span>员工愿意不愿意参与？<span lang="EN-US">”</span>和<span lang="EN-US">“</span>企业制度允许不允许？<span lang="EN-US">”</span>这三个问题。</font>
						<span lang="EN-US">
								<br />
						</span>
						<font face="宋体">解决以上三个问题的主要途径就是<span lang="EN-US">“</span>规范<span lang="EN-US">”</span>。规范是根据企业设备实际，员工素质而制订的工作规程和行为准则。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">规范与标准有什么不同？首先， 规范是企业内部规定，不同企业可以有所不同。而标准则是跨行业、跨企业的。其次，规范是动态可调的，应随设备进步，人员素质进步及时加以调整，而标准则有相对较长时间的稳定性。<span lang="EN-US">TNPM</span>就是规范化的<span lang="EN-US">TPM</span>，是全员参与的，步步深入的，通过制定规范、执行规范、评估效果、持续改善来推进的<span lang="EN-US">TPM</span>。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">二、<span lang="EN-US">TNPM</span>的核心<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<font face="宋体">
						<span lang="EN-US" style="FONT-SIZE: 10pt">2.1</span>
						<span style="FONT-SIZE: 10pt">开展<span lang="EN-US">TNPM</span>主要环节如下：<span lang="EN-US"><o:p></o:p></span></span>
				</font>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">1) </font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">研究运行现场（现场、现事、现物）</font>
						<font face="宋体">
								<span lang="EN-US">
										<br />2) </span>找出规律（原理、优化）</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">3) </font>
						</span>
						<font face="宋体">制订行为（操作、维护、保养、维修）规范（原则）</font>
						<font face="宋体">
								<span lang="EN-US">
										<br />4) </span>评估效果（评价）</font>
						<font face="宋体">
								<span lang="EN-US">
										<br />5) </span>持续改善（改进）<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<font face="宋体">
						<span lang="EN-US" style="FONT-SIZE: 10pt">2.2 TNPM</span>
						<span style="FONT-SIZE: 10pt">规范化的范畴<span lang="EN-US"><o:p></o:p></span></span>
				</font>
		</p>
		<p>
				<font face="宋体">
						<span lang="EN-US" style="FONT-SIZE: 10pt">TNPM</span>
						<span style="FONT-SIZE: 10pt">规范化的范畴为<span lang="EN-US">.</span>为维修程序规范化、备件管理规范化、前期管理规范化、维修模式规范化、润滑管理规范化、现场管理规范化、组织结构规范化以及其它方面的规范化。<span lang="EN-US">TNPM</span>的理念是文明企业的修炼过程，是<span lang="EN-US">“</span>绿色<span lang="EN-US">”</span>企业的营造过程，也是企业文化和灵魂的模塑过程。<span lang="EN-US"><o:p></o:p></span></span>
				</font>
		</p>
		<p>
				<font face="宋体">
						<span lang="EN-US" style="FONT-SIZE: 10pt">2.3 TNPM</span>
						<span style="FONT-SIZE: 10pt">的核心<span lang="EN-US">??</span>四个<span lang="EN-US">“</span>全<span lang="EN-US">”<o:p></o:p></span></span>
				</font>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">1)</font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">以全效率和完全有效生产率为目标</font>
						<span lang="EN-US">
								<br />
						</span>
						<font face="宋体">对于设备系统而言，<span lang="EN-US">TNPM</span>追求的是最大的设备综合效率；对于整个生产系统而言，<span lang="EN-US">TNPM</span>追求的是最大的完全有效生产率<span lang="EN-US">[5][6][8][10]</span>。设备综合效率反映了设备本身的潜力挖掘和发挥，即对设备时间利用上、速度上和质量上的追求。管理者致力于六大损失的控制。完全有效生产率反映了整个生产系统的潜力挖掘和发挥，即从设备前期管理的有效性、企业生产排程、系统同步运行、瓶颈工序攻关、生产计划、组织协调、主次分析等方面提升效率，达到最优。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">2) </font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">以全系统的预防维修体制为载体</font>
						<span lang="EN-US">
								<br />
						</span>
						<font face="宋体">全系统的概念是由时间维、空间维、资源维、和功能维构成的四维空间。时间维代表设备的一生，从规划到报废全过程；空间维代表从车间设备到零件的整个空间。由外到内，由表及里，包含整个生产现场；资源维代表全部的资源要素，由资金到信息，代表系统的物理场；而功能维代表全部的管理功能，是<span lang="EN-US">PDCA</span>循环的拓展，从认识到反馈，代表一个完整、科学的管理过程。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">在这个四维结构之中，任何一个要素发生变化，都会影响其它相应的要素。另一方面，每一要素都会在其它的要素维（空间）上得到映像。例如设备的<span lang="EN-US">“</span>安装<span lang="EN-US">”</span>，它是四维空间中时间维上的一个环节，它在空间维上会有车间、现场、设备、整机、部件以及零件上的考虑；在资源维上又离不开资金、材料、人工、能源和信息这些要素；同样，从管理功能上，一定有一个认识、计划、组织、实施、控制、评价以及反馈的过程。</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">TNPM</font>
						</span>
						<font face="宋体">要求我们在一个四维空间上讨论预防性规范的运作，是最完备的全系统概念。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">3)</font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">以员工的行为全规范化为过程</font>
						<span lang="EN-US">
								<br />
						</span>
						<font face="宋体">规范是对行为的优化，是经验的总结。<span lang="EN-US">TNPM</span>在员工的现场改善活动中，不断地规范着员工的行为。除了生产现场的行为，包括设备的润滑、备件管理、维修管理、故障管理、前期管理、资产管理都要寻求一个最佳的模式，把这个模式固化、文件化，也就是使之规范化，从随机走向科学。从规范做起，促进良好习惯的养成，形成团队的品格、气质和形象，结果和成就就是顺理成章的事。其因果如图<span lang="EN-US">2</span>所示。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span lang="EN-US" style="FONT-SIZE: 10pt">
						<font face="宋体">4) </font>
				</span>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">以全体人员参与为基础</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">“</font>
						</span>
						<font face="宋体">全员<span lang="EN-US">”</span>已成为当代企业管理普适的理念。全员表现在三个方面；</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">??</font>
						</span>
						<font face="宋体">横向的全员，即所有的部门的参与。生产现场的设备维护体系不仅是设备部门的工作，生产、工程、人力资源、财务、工艺等各个部门都应该参与其中。</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">??</font>
						</span>
						<font face="宋体">纵向的全员，即从最高领导到一线的每个员工，都关注生产现场的设备维护保养。</font>
						<span lang="EN-US">
								<br />
								<font face="宋体">??</font>
						</span>
						<font face="宋体">小组自主活动，是全员的一个活跃的细胞。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">在当代形形色色的管理模式中，无论是全面质量管理<span lang="EN-US">??TQM</span>，还是准时生产体系<span lang="EN-US">??JIT</span>，或是精益生产<span lang="EN-US">??Lean Production, </span>几乎都离不开全员的参与。<span lang="EN-US">TNPM</span>以全员为基础是顺理成章的理念。<span lang="EN-US"><o:p></o:p></span></font>
				</span>
		</p>
		<p>
				<font face="宋体">
						<span lang="EN-US" style="FONT-SIZE: 10pt">3.3 TNPM</span>
						<span style="FONT-SIZE: 10pt">的寻找和清除<span lang="EN-US">“</span>六源<span lang="EN-US">”</span>活动<span lang="EN-US"><o:p></o:p></span></span>
				</font>
		</p>
		<p>
				<span style="FONT-SIZE: 10pt">
						<font face="宋体">在推进<span lang="EN-US">5S</span>活动中，员工将会发现一些问题的<s