Oracle神谕

  BlogJava :: 首页 :: 新随笔 :: 联系 :: 聚合  :: 管理 ::
  284 随笔 :: 9 文章 :: 106 评论 :: 0 Trackbacks

#

       系统测试是一个极其重要的环节,就像我们的汽车产品出厂之前的全面检验一样。系统上线之前必须做一次全面的测试,以发现和解决更多的问题,降低系统切换的风险。

  这个阶段通常叫CRP(Conference room pilot)测试,分为单元测试和整体测试,单元测试发现和解决单个模块的问题,通过整体测试来发现和解决各个模块连接的问题。在这里我要重点强调的是整体测试,这个测试必须要请全体项目组参加,而不仅仅是局限在几个关键用户范围内,CRP整体测试必须包括所有的高层领导、中层领导,因为这个测试也是对管理层的一次重要培训,一般在项目实施过程中,中高层没有太多的时间参与具体设计,因此有许多地方他们在CRP测试之前是不明白的。必须通过这样的形式和方法让中高层看到系统演示的结果,让他们看看用系统管理和手工管理的差异,亲身体会一下整个系统连环运作的过程。

  很多项目之所以成功,就是总经理亲自带队全程参加整体CRP测试,整整在会议室坐了一个半天。我们说ERP工程是“一把手工程”,如果说一把手的确做到全程参加整体CRP的话,从这一点看那一把手工程就是落到了实处。当然我们的CRP测试必须是用企业真实的数据、真实的流程,得出真实的结果,而不是瞎编几个数据,走个形式。CRP测试的理念必须是以业务流程为主线来测试,测试流程和数据,而不是仅仅测试系统有没有问题。

posted @ 2008-05-31 09:24 java世界畅谈 阅读(3043) | 评论 (0)编辑 收藏

The SAP HU is used for tracking the handling units used by the materials.  Some common handling units are packagings materials like cartons, pallets etc.

In the SAP system, the handling unit (HU) expands on the shipping unit. Handling units can be nested and you can also create new handling units from several handling units as often as you like. At the material item level, HUs contain the complete material identification, the quantity, and, in the case of serial numbers, the respective object list. Handling units have unique,
scannable identification numbers that can be developed according to standards such as EAN 128 or SSCC.

Handling units contain all inventory management information of the materials they contain that are maintained in Inventory Management. There are also status messages that you can call up at any time that indicate whether a handling unit is only planned or if the ship-to party has been notified of the arrival of this handling unit, or whether it is in the warehouse or has already been posted to goods issue. The integrated history function also records each business process in
the life cycle of each handling unit, meaning that you can track the handling unit’s path and development at any time.
Refer to : Logistics -> Central Functions -> Handling Unit Management

In HU-managed storage locations, all goods movements are executed through the specification of the respective HUs, and Inventory Management is performed through the handling units. If you are working without HU-managed storage locations, you can work with handling units (without stock information) as before in the delivery and in the shipment.

In HU-managed storage locations, materials can be managed in HUs only. Mixed stock made up of packed and non-packed materials within the same storage location are not supported. HUs can also be managed in interim storage types. Unpacking a material from a HU means that the stock of the material is posted to a storage location that is not HU-managed.

If you call up normal material movements in connection with an HU-managed storage location, a delivery is created, rather than a direct material posting, which has been the procedure up to now.

Please note that if you want to use 311 to move the material already in stock, but in a non HUM Storage Location and you want to transfer those materials into a HUM Storage Location 304.  If this is the case you can use the transaction VLMOVE with the destination plant and storage location. Before that you have to create the HU with the transaction code HU02 Storage location: where the material is and the status: in stock.

Handling units are unique at client level in at least one system. Using an indicator at client level, you can control whether you are going to work with the HU functions. Since the handling unit is a physical unit, the central logistics processes are controlled through the input of the handling unit identification. These processes include putaway, picking, and stock transfers, as well as goods receipts and goods issues.

A handling unit’s mobility can be limited if quality checks are active. Changes in the stock category caused by a quality inspection are made using a posting change in the handling unit.

There is also a report available that you can use to find and display handling units using different selection criteria such as material, packing instruction, or storage location.

Although the handling unit is basically a unit that remains constant in the system, you can change it by repacking the materials it contains. All the packing functions, such as packing, repacking, and unpacking, are completely supported by the handling unit functionality. In this way, handling units can be created in production, during goods receipt, or in the packing areas of the warehouse. If you have automatic packing, the handling unit is created from the packaging proposals defined in the system (from the packing instructions, for example).

posted @ 2008-05-30 22:00 java世界畅谈 阅读(3040) | 评论 (2)编辑 收藏

充分准备是高效率的必要条件!
posted @ 2008-05-28 10:38 java世界畅谈 阅读(107) | 评论 (0)编辑 收藏

操作过程的规范化。在整个操作过程中,要形成文档化、规范化。
宁可多整理花一些时间来梳理,避免相应的现场的混乱、无计划,减少临场的发挥因素。
准备更加重要!
posted @ 2008-05-28 09:35 java世界畅谈 阅读(135) | 评论 (0)编辑 收藏

(1)项目的概况、目标、要解决什么问题、所涉及的组织机构
(2)业务操作流程(包括主流程及分之流程)图形展示及相关的描述
(3)业务系统流程(包括主流程及分之流程)图形展示及相关的描述
(4)角色 业务流程 操作流程 操作时间 异常
(5)关注点、特殊点、核心点的处理
(6)单据格式、报表格式、数据勾稽关系
-----需求调研主要关注的是要做什么的问题,对怎么样去做的事情可以不做过多考虑。
posted @ 2008-05-20 13:17 java世界畅谈 阅读(169) | 评论 (0)编辑 收藏

    做为一个leader,一定要对部下的想法有一定的了解。不作为的现象是不正常的。要了解其中的原因?现在究竟在做什么?想做什么?在一个事必躬亲的情况下,对部下做事情的成就感就会有很大打击。如何做?如何更好的解决这些问题?

posted @ 2008-05-07 14:31 java世界畅谈 阅读(110) | 评论 (0)编辑 收藏

不知不觉,立夏已经来了。街上的人穿短袖的人越来越多了。
在相应的时间,练练内功是很重要的环节。把公司的每个人培养成精英。

posted @ 2008-05-05 11:09 java世界畅谈 阅读(137) | 评论 (0)编辑 收藏

今年的春夏来的有些晚。按照我们以前的趋势推算,这个季节应该已经到。但是,现在天似乎还是那样的不紧不慢。感冒等多种病症又不断侵袭过来。我们要做的无非是积极进取,抵抗相应的疾病,为春夏的到来做好相应的准备。
posted @ 2008-04-28 09:38 java世界畅谈 阅读(118) | 评论 (0)编辑 收藏

这几日,生病了。嗓子痛的要命,又感冒。
身体是革命的本钱。
烟要戒掉,这个玩意即花钱又危害健康。理智些,戒掉!可以寻找一些替代品。
注意身体的健康,保证一定的运动量!
posted @ 2008-04-26 17:10 java世界畅谈 阅读(120) | 评论 (0)编辑 收藏

     专注!必要的专注,主要是不要在一些小的事情有过多的思考或行动,这个对整个的操作本身上有很多相应问题。专注的目标在于高效率!

posted @ 2008-04-22 09:42 java世界畅谈 阅读(125) | 评论 (0)编辑 收藏

仅列出标题
共29页: First 上一页 6 7 8 9 10 11 12 13 14 下一页 Last