﻿<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:trackback="http://madskills.com/public/xml/rss/module/trackback/" xmlns:wfw="http://wellformedweb.org/CommentAPI/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/"><channel><title>BlogJava-Oracle神谕-随笔分类-供应链及物流</title><link>http://www.blogjava.net/javaora/category/2179.html</link><description /><language>zh-cn</language><lastBuildDate>Sat, 31 May 2008 08:03:55 GMT</lastBuildDate><pubDate>Sat, 31 May 2008 08:03:55 GMT</pubDate><ttl>60</ttl><item><title>SAP HU - SAP Handling Unit Management (HUM) </title><link>http://www.blogjava.net/javaora/archive/2008/05/30/204199.html</link><dc:creator>java世界畅谈</dc:creator><author>java世界畅谈</author><pubDate>Fri, 30 May 2008 14:00:00 GMT</pubDate><guid>http://www.blogjava.net/javaora/archive/2008/05/30/204199.html</guid><wfw:comment>http://www.blogjava.net/javaora/comments/204199.html</wfw:comment><comments>http://www.blogjava.net/javaora/archive/2008/05/30/204199.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/javaora/comments/commentRss/204199.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/javaora/services/trackbacks/204199.html</trackback:ping><description><![CDATA[<p><strong>The SAP HU is used for tracking the handling units used by the materials.&nbsp;</strong> Some common handling units are packagings materials like cartons, pallets etc.
<p>In the SAP system, the handling unit (HU) expands on the shipping unit. Handling units can be nested and you can also create new handling units from several handling units as often as you like. At the material item level, HUs contain the complete material identification, the quantity, and, in the case of serial numbers, the respective object list. Handling units have unique, <br />
scannable identification numbers that can be developed according to standards such as EAN 128 or SSCC.
<p>Handling units contain all inventory management information of the materials they contain that are maintained in Inventory Management. There are also status messages that you can call up at any time that indicate whether a handling unit is only planned or if the ship-to party has been notified of the arrival of this handling unit, or whether it is in the warehouse or has already been posted to goods issue. The integrated history function also records each business process in <br />
the life cycle of each handling unit, meaning that you can track the handling unit&#8217;s path and development at any time. <br />
Refer to : <font color="#cc0000">Logistics -&gt; Central Functions -&gt; Handling Unit Management</font>
<p>In HU-managed storage locations, all goods movements are executed through the specification of the respective HUs, and Inventory Management is performed through the handling units. If you are working without HU-managed storage locations, you can work with handling units (without stock information) as before in the delivery and in the shipment.
<p>In HU-managed storage locations, materials can be managed in HUs only. <font color="#cc0000">Mixed stock made up of packed and non-packed materials within the same storage location are not supported</font>. HUs can also be managed in interim storage types. Unpacking a material from a HU means that the stock of the material is posted to a storage location that is not HU-managed.
<p>If you call up normal material movements in connection with an HU-managed storage location, a delivery is created, rather than a direct material posting, which has been the procedure up to now.
<p>Please note that if you want to use <font color="#cc0000">311 to move the material already in stock, but in a non HUM Storage Location</font> and you want to transfer those materials into a <font color="#cc0000">HUM Storage Location 304</font>.&nbsp; If this is the case you can use the transaction <strong><font color="#cc0000">VLMOVE</font></strong> with the destination plant and storage location. Before that you have to create the HU with the transaction code <strong><font color="#cc0000">HU02</font></strong> Storage location: where the material is and the status: in stock.
<p>Handling units are unique at client level in at least one system. Using an indicator at client level, you can control whether you are going to work with the HU functions. Since the handling unit is a physical unit, the central logistics processes are controlled through the input of the handling unit identification. These processes include putaway, picking, and stock transfers, as well as goods receipts and goods issues.
<p>A handling unit&#8217;s mobility can be limited if quality checks are active. Changes in the stock category caused by a quality inspection are made using a posting change in the handling unit.
<p>There is also a report available that you can use to find and display handling units using different selection criteria such as material, packing instruction, or storage location.
<p>Although the handling unit is basically a unit that remains constant in the system, you can change it by repacking the materials it contains. All the packing functions, such as packing, repacking, and unpacking, are completely supported by the handling unit functionality. In this way, handling units can be created in production, during goods receipt, or in the packing areas of the warehouse. If you have automatic packing, the handling unit is created from the packaging proposals defined in the system (from the packing instructions, for example). </p>
<img src ="http://www.blogjava.net/javaora/aggbug/204199.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/javaora/" target="_blank">java世界畅谈</a> 2008-05-30 22:00 <a href="http://www.blogjava.net/javaora/archive/2008/05/30/204199.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item><item><title>计划是供应链管理的核心</title><link>http://www.blogjava.net/javaora/archive/2005/07/18/7903.html</link><dc:creator>java世界畅谈</dc:creator><author>java世界畅谈</author><pubDate>Mon, 18 Jul 2005 01:48:00 GMT</pubDate><guid>http://www.blogjava.net/javaora/archive/2005/07/18/7903.html</guid><wfw:comment>http://www.blogjava.net/javaora/comments/7903.html</wfw:comment><comments>http://www.blogjava.net/javaora/archive/2005/07/18/7903.html#Feedback</comments><slash:comments>0</slash:comments><wfw:commentRss>http://www.blogjava.net/javaora/comments/commentRss/7903.html</wfw:commentRss><trackback:ping>http://www.blogjava.net/javaora/services/trackbacks/7903.html</trackback:ping><description><![CDATA[<P>供应链已被当成企业成功的关键要素，实施供应链管理的企业与战略性供应商分享设计及需求信息，已将触角延伸至企业之外。供应链管理就是利用线形规划等核心优化技术，对从供应商的供应商、供应商、企业、客户到客户的客户的整个链条的管理和优化。<BR>......<BR>供应链管理重在两个部门：供应链的计划和执行。计划包括仓储计划、预测需求计划、物流的配置计划、生产计划、销售计划等；供应链的执行是以订单的执行和物流的执行来支撑的。<BR>......<BR>....协同是提高供应链可视性的手段，计划是供应链管理的核心。<BR>.......<BR>企业对计划的重视程度不够，只重视执行而不重视计划，往往是导致供应链管理系统应用不理想的重要原因。...而自身又不在预测和计划上下功夫。......计划恰恰是企业以及供应链运作的根本。<BR>　做到有效的供应链管理需要企业有效地做到以下三点:1.观念的转变和理念上重视，企业必须对供应链有足够的重视，把供应链的效率作为企业的核心竞争力之一来抓。2.实施供应链管理是企业持续改进、持续优化的进程，而不是项目上线任务就能结束，企业要有持续的动力。3.要有持续的投资、有专门的队伍，从组织上、人员上给予保障，并且企业要把这些投资看作是提高核心竞争力的必要条件，而不是负担。这是成功的供应链管理基础。 <BR>......<BR>记者:i2的供应链管理系统包含哪些功能模块? </P>
<P>　　傅淼:i2供应链管理系统的主要功能包括:订单履行(协同补货、客户订单履行、供应链可视性)、供应商寻源与采购(协同供应执行、危险物料管理、产品寻源与重复使用、寻源执行、供应商战略及绩效管理)、供应与需求计划(协同供应执行、需求管理、工厂解决方案、库存优化、销售与运作管理、供应链可视性、供应管理)、运输与配送(补货计划、战略网络设计与分析、供应商可视性、运输投标协同、运输建模与分析、运输计划与管理)、内容与数据服务、供应链运作服务平台(业务流程执行、统一基础设施服务、主数据管理、绩效管理)。 </P>
<P><BR>摘选于<A href="http://www.topoint.com.cn/zyzx/view.asp?id=5613&amp;cc=0">http://www.topoint.com.cn/zyzx/view.asp?id=5613&amp;cc=0</A></P><img src ="http://www.blogjava.net/javaora/aggbug/7903.html" width = "1" height = "1" /><br><br><div align=right><a style="text-decoration:none;" href="http://www.blogjava.net/javaora/" target="_blank">java世界畅谈</a> 2005-07-18 09:48 <a href="http://www.blogjava.net/javaora/archive/2005/07/18/7903.html#Feedback" target="_blank" style="text-decoration:none;">发表评论</a></div>]]></description></item></channel></rss>